The Fuller Warren Bridge in Jacksonville, Florida
The Fuller Warren Bridge is a prestressed concrete girder bridge that carries I-95 across the St. Johns River. As of 2010, the current bridge was completed in October 2002 to replace the original bascule bridge span that was built in 1954. The entire bridge is over 7,500' ft long, with a main span of 250' feet and a vertical clearance of 75' ft. The current Fuller Warren bridge now carries eight lanes across the span. The original Fuller Warren bridge was a toll bridge until 1988, when the city of Jacksonville abolished toll collections.